During the construction phase, building owners benefit from our many years of experience as a front door manufacturer. Our construction doors securely close the front door opening, but guarantee access to the property. We install a finished door frame with a temporary door leaf made of OSB boards and a mortise lock (the construction cylinder must be provided by the customer). The edges of the door frame and the top of the threshold are fitted with a protective profile. This makes the construction process considerably easier. The ideal time to install the construction door is in the shell, before the plaster and screed work, when the roof is closed and the windows are in place.
Doorsin the shell
Optimum protection during the entire construction phase
From shell construction to moving in, we are your reliable partner. Our construction doors are a well thought-out and practical solution to make the construction process more efficient. Robustly constructed, they meet the requirements of a heavy-duty site door and provide secure access throughout the construction phase. We take care of the delivery and installation of the site door, so you can focus your time and resources on other important aspects of your building project.
Advantagesa GÜTA construction door
Fully-fledged front door
Our construction doors are robust and fully functional to meet the requirements of the construction phase.
Measurement in shell construction
As soon as all the walls are in place, we take precise measurements to ensure a perfectly fitting door.
Threshold as screed formwork
For doors with a threshold to the unfinished floor (RFB), this also serves as screed formwork, which saves additional work steps.
Front door threshold for floor height
The height of the top edge of the finished floor (OK FFB) can be derived from the height of the top edge of the finished threshold. We recommend a level difference of approx. 3 cm.
Clean wall connections
Connections to the walls can be neatly finished by the plasterer or drywall builder, ensuring a professional end result.
Final assembly of the front door leaf
The finished door leaf is usually installed shortly before you move in. Please inform us in advance of the desired date for final installation.
Combination with stairs/building stairs
Our front doors can be ideally combined with our staircases and building staircases, as they are installed on the same date.
güta Konfigurator
güta Türkonfigurator
Konfigurieren Sie Ihre Traumtüre ganz einfach selbst. Experimentieren Sie mit Holzarten, Farben, Fensterausschnitten und Griffen und gestalten Sie die perfekte Haustüre für Ihr Zuhause.
Bautüren
Damit Ihre Baustelle während der Bauphase sicher verschlossen ist, montieren wir temporäre Bautüren. Sprechen Sie uns an.
Unikate
Bei uns ist jede Haustüre einzigartig und mit viel Liebe zum Detail gefertigt. Diese handwerkliche Herstellung ermöglicht eine individuelle Gestaltung nach Ihren Wünschen. Mehr erfahren Sie hier:
Besuchen Sie unsere AusstellungIn Sontheim
In unserem lichtdurchfluteten Showroom zeigen wir Ihnen verschiedene Treppenarten, Haustüren und Holzmuster, unterstützen Sie bei der Auswahl und stehen Ihnen in allen technischen Fragen beratend zur Seite.
Bitte stellen Sie vor einem Besuch eine Terminanfrage. Unser Außendienst meldet sich zur Vereinbarung eines Termins telefonisch oder per E-Mail bei Ihnen.
Terminanfrage stellen
Wir freuen uns auf Sie!
Ihr Ansprechpartnerfür Haustüren
Jakob Strahllechner
Assistenz der Geschäftsführung