Clients also benefit from our many years of experience as stair builders during the construction phase. Our construction stairs offer craftsmen the opportunity to ascend and descend comfortably and safely between floors. The structural staircase is covered with construction steps and a construction guardrail is installed as fall protection. This makes the construction process considerably easier. The ideal time to install the construction staircase is in the shell before the plastering and screed work, when the roof is closed and the windows are in place
Stairsin the making
The perfect solution from shell construction to moving in
We accompany you from the shell construction phase to moving in. Our construction stairs are a well thought-out and practical solution that optimizes the construction process and provides you with safe access throughout the entire construction period. We deliver and install the construction stairs so that you don’t have to worry about a thing. This solution is particularly suitable for semi-mounted staircases and double-stringer staircases.
Benefitsof a güta site staircase
Fully-fledged building staircase
Our construction stairs are robust and fully functional to meet the requirements of the construction phase.
Safety in the building shell
The finished supporting structure (stringer) is assembled in the shell, including construction steps and construction railings, to provide immediate safety.
Measurement in shell construction
As soon as all the walls are in place, we take precise measurements to ensure a staircase that fits perfectly.
Ceiling front panel serving as screed formwork
In the case of stairs with a ceiling end panel, this also serves as screed formwork, which saves additional work steps.
Landing edge trim for floor level
The exit ledge specifies the height of the finished exit step (corresponds to the top edge of the finished floor, OK FFB) and facilitates further construction planning.
Clean wall connections
Connections to the walls can be neatly finished by the plasterer or drywall builder, ensuring a professional end result.
Final assembly of the steps and railings
The finished steps and the final railing are usually installed shortly before moving in. Please inform us in advance of the desired date for final installation.
Combination with front doors/building doors
Our staircases can be ideally combined with our front doors and building doors, as they are installed on the same day.
Besuchen Sie unsere AusstellungIn Sontheim
In unserem lichtdurchfluteten Showroom zeigen wir Ihnen verschiedene Treppenarten, Haustüren und Holzmuster, unterstützen Sie bei der Auswahl und stehen Ihnen in allen technischen Fragen beratend zur Seite.
Bitte stellen Sie vor einem Besuch eine Terminanfrage. Unser Außendienst meldet sich zur Vereinbarung eines Termins telefonisch oder per E-Mail bei Ihnen.
Terminanfrage stellen
Wir freuen uns auf Sie!
Ihr Ansprechpartnerfür Treppen
Markus Graf
Geschäftsführer




