Clients also benefit from our many years of experience as stair builders during the construction phase. Our construction stairs offer craftsmen the opportunity to ascend and descend comfortably and safely between floors. The structural staircase is covered with construction steps and a construction guardrail is installed as fall protection. This makes the construction process considerably easier. The ideal time to install the construction staircase is in the shell before the plastering and screed work, when the roof is closed and the windows are in place
Stairsin the shell
The perfect solution from shell construction to moving in
We accompany you from the shell construction phase to moving in. Our construction stairs are a well thought-out and practical solution that optimizes the construction process and provides you with safe access throughout the entire construction period. We deliver and install the construction stairs so that you don’t have to worry about a thing. This solution is particularly suitable for semi-mounted staircases and double-stringer staircases.


Advantagesa güta building staircase
Fully-fledged building staircase
Our construction stairs are robust and fully functional to meet the requirements of the construction phase.
Safety in the building shell
The finished supporting structure (stringer) is assembled in the shell, including construction steps and construction railings, to provide immediate safety.
Measurement in shell construction
As soon as all the walls are in place, we take precise measurements to ensure a staircase that fits perfectly.
Ceiling end panel as screed formwork
In the case of stairs with a ceiling end panel, this also serves as screed formwork, which saves additional work steps.
Outlet strip for floor height
The exit ledge specifies the height of the finished exit step (corresponds to the top edge of the finished floor, OK FFB) and facilitates further construction planning.
Clean wall connections
Connections to the walls can be neatly finished by the plasterer or drywall builder, ensuring a professional end result.
Final assembly of the steps and railings
The finished steps and the final railing are usually installed shortly before moving in. Please inform us in advance of the desired date for final installation.
Combination with front doors/building doors
Our staircases can be ideally combined with our front doors and building doors, as they are installed on the same day.
Visit our exhibitionIn Sontheim
In our light-flooded showroom, we show you different types of stairs, front doors and wood samples, support you in your selection and advise you on all technical questions.
Please request an appointment before visiting us. Our sales representatives will contact you by phone or e-mail to arrange an appointment.
Make an appointment request
We look forward to seeing you!
Your contact personfor stairs

Markus Graf
Managing Director